page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60 page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
page 135
page 136
page 137
page 138
page 139
page 140
page 141
page 142
page 143
page 144
page 145
page 146
page 147
page 148
page 149
page 150
page 151
page 152
page 153
page 154
page 155
page 156
page 157
page 158
page 159
page 160
page 161
page 162
page 163
page 164
page 165
page 166
page 167
page 168
page 169
page 170
page 171
page 172
page 173
page 174
page 175
page 176
page 177
page 178
page 179
page 180
page 181
page 182
page 183
page 184
page 185
< prev - next > Energy Hydro power civil_works_guidelines_for_micro_hydro (Printable PDF)
58 CIVIL WORKS GUIDELINES FOR MICRO-HYDROPOWER IN NEPAL
Box 4.6 HDPE headrace pipes, the Ghandruk experience
The 50 kW Ghandruk micro-hydro scheme
was one of the first micro-hydropower projects
that Practical Action Nepal was involved in.
HDPE pipe has been used successfully for
the long headrace through forest, but lessons
should be learned from the problems experi-
enced:
Sticks and leaves entering the pipe at the
headworks get wedged at the weld beads,
causing pipe blockage.
Vandals throwing stones into the break
pressure tanks.
Pipe collapse due to negative pressure at a
high point (where the pipe is below the
hydraulic grade line).
Surging flow due to air being drawn into the
pipe at break pressure tanks.
At one short location, the hillside was not very
stable and the HDPE pipe has been supported
by galvanised wires tied to trees as can be
seen in Photograph 4.18. Also notice that the
HDPE pipe can be bent when the bend radius
is large. However, it would have been techni-
cally sounder if a gabion wall had been built
downhill of the pipe alignment and the pipe cov-
ered with soil as shown in Figure 4.8 Photo-
graph 4.19 shows a mitred bend on the
Ghandruk HDPE headrace pipe. This was
made by cutting pipe sections at an angle and
them by heat welding. It has started leaking at
the bend and the villagers have wrapped it
with plastic sheets and galvanised wire. Bends
that are constructed by cutting and welding
pipe sections require care during thejoining
process (i.e., the more joints, the higher the
likelihood of leakage). If there is some head
over the headrace pipe, then there can be sig-
nificant forces at the bend as discussed in
Chapter 7. Such forces can weaken the joints
and cause leakage. Also note that the pipe
section shown in the photograph should have
been buried.
Photo 4.18 HDPE headrace pipe along unstable alignment, Ghandruk micro-hydro
scheme, Nepal.
Photo 4.19 Bend prepared by cutting and welding the HDPE
headrace pipe at Ghandruk